B-1.1, r. 2 - Construction Code

Full text
8.71. Except in the case of piping supplying a marina bulk plant, a contractor or owner-builder may install a petroleum equipment installation only if it has separate pipe lines for
(1)  unleaded regular or premium automotive gasoline included in Class 1 petroleum products;
(2)  Class 1 petroleum products other than automotive gasoline;
(3)  Class 2 petroleum products; and
(4)  Class 3 petroleum products.
O.C. 220-2007, s. 1; O.C. 87-2018, s. 35.
8.71. Except in the case of piping supplying a marina bulk plant, a contractor or owner-builder may install a petroleum equipment installation only if it has separate pipe lines for
(1)  unleaded regular or premium gasoline included in Class 1 petroleum products;
(2)  Class 1 petroleum products other than gasoline;
(3)  Class 2 petroleum products; and
(4)  Class 3 petroleum products.
O.C. 220-2007, s. 1.